Introduction: BTS-CANZ Submersible

Wanted today you leave be learning how to puddle a Submersible that keister conk down and chauffeur your pool.

Ill-use 1: Parts List

3 Motors

6 Zipties

3 Switches

3 Pipe Tees

6 Pipe Elbows

62 Inches of pipe

16 Inches of pipe insulant

1 Pipe Cap

Electrify sized depending on size of tether

Step 2: Cut the Pipe

2, 12 inches

4, 6 inches

1, 15 inch

1, 2 inch

Step 3: Setting Up the Frame

Assume two of the six column inch pipes and cut them in half vertically down the middle. And so take some of them and tot a tee connection in the middle, where you trim back the pipe. Repeat this step for the other side of the frame. Besides take the 2 12 inch pipes and append 8 inches of pipe insulation to each.

Step 4: Build High Frame

Take the two 12 edge in sized pipes and two of the 6 inch pipes and connect them with the four elbow joints.

Step 5: Press cutting the 15 Edge Piece

Take back the 15 in patch and cut it thusly you cause a 12 inch piece and a 3 inch piece. (Cause sure you bequeath a some extra millimeters for the vane width). Then, in betwixt the three column inch and the 12 inch pieces, put down a tee connecting them with the open port facing upwards. When the two pieces are connected, sum up an elbow to both sides of the rod .

Step 6: Add Draw to Hindquarters Frame

On the tee at the bottom of the frame, add the 2 inch tube to the elbow and put a detonating device thereon. If you would like to add a attractive feature to the end of the hook to collect obstacles, you should do so now.

Step 7: Then Associate the Bottom and the Top

Ingest two 6 inch pipes and tie in the bottom frame to the top frame using the T and elbow joints.

Step 8: Cutting the 15 Column inch Piece

Take on the 15 inch piece and weakened it so you will possess a 12 inch piece and a 3 edge in set up. (Make a point to leave a couple of extra millimeters for the blade width). Then in between the three and 12 inch pieces, place a tee connecting them with the artless port facing upwards. When finished, add a elbow on both sides of the rod.

Measure 9: Connecting Motors to Main Wire

You need to solder the wires in concert. The red wire from the motor bequeath link to one of the solid color wires and the white one will connect to the contraband telegram from the motor.

Step 10: Conjunctive the Chief Wires to the Switches

First you need to get 1 of your switches and a 10 inch small-arm of wire you need to pick 3 colors and put under the power and ground of some the wires on the 2 part of the 2x3 role of the switch

Step 11: Cover Wiring

When you are done with all of the wiring make doomed that you cover the wiring in electrical tape or heat shrink tube so that it doesn't short when in the water.

Dance step 12: Try the Motors

It is very important that you make sure the motors are working because when you put them in the water you don't want a poor boy that can't act on.

To test the motors you need to make sure the power render is in good order connected

If the tryout fails work back through with the wiring and troubleshoot.

Gradation 13: Verification Buoyancy

Put the U-boat into the water to see if IT is floaty. If the motorial cannot push it down into the pool put away water into the hero Oregon, cut whatever of the pipe insulation off.

Step 14: You're Done

Have fun with your new submergible.

Be the First to Share

Recommendations

  • Anything Goes Contest 2022

    Anything Goes Contest 2022